arrow_back
Videos
1. Introduction to Primavera P6
2. Calenders, project codes and values
3. Work Breakdown Structure
4. WBS, work packages tabular view, and defining activity codes and values
5. WBS Chart View and Formatting + WPs and Docs
6. Defining Activities, Estimate Activity Duration, and Activity Type
7. Assigning Relationships & Lags
8. Assigning Calendars
9. Assigning Activity Codes
10. CPM Scheduling (Critical Path Method), Schedule Log (Report), and Filtration
11. Applying Constraints
12. Grouping and Sorting
13. Saving, Exporting and Importing the Layouts
14. Filtering
15. Bars Formatting, Columns, Time Scale Customization, and Activity Network Diagram
16. Print Preview & Page Set-Up
17. Creating Resource Pool (Basic Rates)
18. Defining and Assigning Roles
19. Defining Cost Accounts
20. Adding Expenses
21. Assigning Resources, Defining Budgeted Units & Assigning Cost Accounts
22. Assigning Resource Curves & Global Change
23. Resource Usage Profile Resource Assignments (Spreadsheets)
24. How to make Copy, Import Export Plan
25. Progress Update
26. MaintainingAssigning Baseline, Variance Analysis (Planned vs Actual)
27. Reflection of Project
Chapter 1: P6 Intro, OBS, EPS & Calendars
study notes
Chapter 2: WBS, User Preferences, Activities & Relationships
study notes
Chapter 3 : Activity Network, Trace logic & Timescale
study notes
Chapter 4 : Activity Types, Codes, Group & Sort
study notes
Chapter 5 : Layout, Constraints, Roles & Currencies
study notes
Chapter 6 : Defining & Assigning Resources, Resource Codes, Resource Calendar
study notes
Chapter 7 : Resource Analysis, Resource Curve, Duration Types
study notes
Chapter 8 : Resource Levelling, WP's & Doc's
study notes
Chapter 9 : Updating with Resources, EVA
study notes
Chapter 10 : Reports, UDF, Global Change, Print, Export
study notes
Reference Documents
Primavera manual
Preview - Oracle Primavera (P6) - Self Paced
Discuss (
0
)
navigate_before
Previous
Next
navigate_next